Azure is more than a place to run virtual machines. It is the cloud platform that hosts Microsoft 365, runs your Power Platform, anchors your Dynamics 365 data, and (when designed properly) reduces total IT cost while improving resilience. We design Azure landing zones, migrate workloads from on-prem and other clouds, operate FinOps to control spend, and run Azure-managed services with named engineers and written SLAs.
Azure Cloud Adoption Framework (CAF) aligned landing zone: subscription strategy, network topology, identity federation with Entra ID, governance policies, security baseline (Defender for Cloud), monitoring (Azure Monitor, Sentinel).
On-prem-to-Azure migration via Azure Migrate. VMware, Hyper-V, physical Windows / Linux. Lift-and-shift where speed matters; rehost-and-optimise where cost matters; refactor to PaaS where the upside justifies. Migration sequencing aligned to business risk tolerance.
Azure cost-management policies, tagging, budgets, alerts. Right-sizing recommendations applied monthly. Reserved instance / savings-plan analysis. Cost-allocation reporting per business unit. Typical savings 20-40% within 90 days for unmanaged tenants.
Defender for Cloud across IaaS, PaaS, and containers. Azure Sentinel SIEM. Azure Policy for compliance enforcement. PDPL, ISO 27001, DFSA, ADGM, DHA, NESA-aligned controls. Microsoft compliance documentation passed through.
24/7 monitoring, patching, backup management, change management, incident response on Azure workloads. Same operational model as on-prem managed services but Azure-native tooling.
Azure OpenAI Service for enterprise generative AI. Azure AI Studio for model fine-tuning and deployment. Responsible-AI policies. We deploy use cases like document summarisation, customer-service triage, internal knowledge search.
Azure licensed and managed through us as your Microsoft CSP. Single partner across Azure, M365, D365, Power Platform, Copilot. Consolidated billing, one accountable team, no cross-vendor handoffs.
We deploy a proper Cloud Adoption Framework landing zone before migrating workloads. Most "Azure mess" stories come from migrating production workloads into a flat single subscription with no governance. We invest the first 3-4 weeks in foundation.
Cost-management policies, tagging strategy, budgets, alerts configured during landing zone. Workloads are sized and reserved from the start. Saves you the typical 30-40% remediation work that comes from un-governed Azure adoption.
Workloads deployed to Azure UAE Central by default for data-residency-aligned operations. UAE North for paired-region replication. EU regions only where business reason justifies non-UAE residency.
Businesses moving on-prem servers, file servers, SQL databases, line-of-business apps to Azure.
DFSA, ADGM-aligned workloads requiring resilience, audit, compliance evidence at platform level.
EMR, PACS, patient apps, telehealth platforms hosted on Azure with DHA-aligned controls.
E-commerce platforms, customer-engagement systems, multi-branch operations on Azure.
Azure IoT Hub, edge devices, predictive maintenance, supply-chain platforms.
Student information systems, LMS, exam platforms hosted on Azure with KHDA-aligned controls.
| Feature | Microsoft Azure | AWS | Google Cloud | On-prem (status quo) |
|---|---|---|---|---|
M365 native integration | Connectors | Connectors | Limited | |
D365 native hosting | Limited | Limited | N/A | |
UAE Central region | UAE region | Limited UAE | N/A | |
PDPL-aligned data residency | Partial | Self-controlled | ||
Hybrid AD / Entra ID integration | Federation needed | Federation needed | AD-native | |
OpenAI / Azure AI services | Bedrock | Vertex AI | N/A | |
Power Platform / Fabric native | N/A | |||
Sentinel SIEM native | Different SIEM stack | Different SIEM stack | On-prem SIEM | |
CapEx required | None (OpEx) | None (OpEx) | None (OpEx) | High (hardware) |
2 weeks
Workload inventory, migration assessment (Azure Migrate), TCO model, target architecture. Business outcomes defined, risk register opened, FinOps strategy agreed. Output: written Azure adoption strategy.
3-4 weeks
CAF-aligned landing zone: subscription strategy, network topology, identity federation, governance policies, security baseline, monitoring foundation, tagging and FinOps controls.
8-16 weeks (variable)
Workloads migrated in waves by priority and risk. Lift-and-shift first for speed, then optimise post-migration. Cutover orchestrated with named runbooks. Hypercare for 2-4 weeks after each wave.
Continuous
24/7 monitoring, patching, backup management. Monthly FinOps review, quarterly architecture review, annual Microsoft release-wave evaluation. Continuous optimisation based on workload telemetry.
“We had a flat Azure tenant with 47 untagged resources spread across 3 subscriptions, monthly cost trending up steeply, and no idea what was running. GR brought in a CAF-aligned landing zone, retagged everything, found 11 zombie VMs we no longer needed, right-sized another 18, and applied reserved-instance commitments where it made sense. Our monthly Azure bill came down meaningfully in the first 90 days and our team finally understands what is running.”
A scoping call covers current state (on-prem, cloud, hybrid), business outcomes, workload inventory, target architecture, compliance posture. Output: written Azure adoption strategy with phasing, timeline, indicative cost.
Explore more solutions that work great with this service