Construction is one of the largest UAE sectors and one of the most IT-fragmented. Head-office ERP, project-management software (Procore, Aconex, Asite), BIM coordination (Autodesk BIM 360, Revit), site connectivity to tower-block sites and labour camps, mobile-device fleets for foremen and inspectors. We deliver integrated IT for construction with the project-rhythm coverage your operation needs.

Revit, BIM 360, Civil 3D, AutoCAD daily ops. Workstation performance tuning for BIM workflows, licence governance, central-file co-authoring infrastructure.
Procore, Aconex, Asite, PlanGrid, Newforma. Daily operations, user provisioning per project, integration with ERP, document-archive discipline.
Operating environment for SAP, Oracle, Sage, Microsoft Dynamics, JD Edwards, Viewpoint Vista. Project-revenue recognition, multi-currency, contractor and supplier integration.
Tower-block site WiFi, labour-camp connectivity, satellite/4G backup for remote sites, site-office network setup. Resilient connectivity for high-stakes site IT.
Foremen tablets, inspector phones, sub-contractor devices. Intune-managed deployment, security baseline, remote wipe on loss, application packaging for site-specific apps.
SharePoint or specialist construction-document platforms. Permissions per project, retention policy for as-built archives, version control for drawings and specifications.
Defender XDR with construction-aware tuning. Multi-party project data segmentation, sub-contractor access controls, IP protection for design files.
Each project has its own data scope, user list, and access control. Project closeout includes IT decommissioning. Project-portfolio dashboard for group oversight.
Microsoft Entra ID with B2B for sub-contractors, project-duration access, automatic deprovisioning on project closeout. Critical for the high-turnover construction workforce.
Engineers understand RFI, snagging, handover, defects-liability period, retention payment. Construction terminology is fluent; tickets get triaged correctly the first time.
Setting up reliable IT at a 30-storey tower site, a labour camp in Sonapur, or a temporary site office in Dubai South is not generic IT. We have shipped site connectivity at 40+ UAE construction sites.
Construction projects involve owner, main contractor, sub-contractors, consultants, regulators. Each party has IT access requirements. We design the data and access boundaries from project mobilisation to closeout.
Pouring concrete on a Friday night needs IT support. Pre-commissioning weekends need IT support. Our SLA respects construction rhythm, not just office hours.
General contractors delivering buildings, infrastructure, mega-projects. Full IT scope from head office to site.
MEP, structural, finishing trades. Lighter IT footprint but with specialist software needs.
Developers with construction in-house or contracted-out. Strong document-management and CRM needs.
Heavy BIM and CAD workstation operations, document-management, multi-project administration.
ERP-heavy operations, dispatch IT, mobile-device fleets, integration with main contractor portals.
Project-duration IT setup, multi-party access, project-closeout discipline.
| Feature | GR construction IT | Generic SMB MSP | In-house construction IT |
|---|---|---|---|
BIM/CAD workstation expertise | |||
Site connectivity capability | Specialist hire | ||
Construction ERP experience | |||
Mobile-fleet management | Generic | ||
Multi-party project IT | In-house process | ||
Project-rhythm SLA | |||
24/7 site cover | On-call rota | ||
Per-firm monthly cost | Predictable | Cheaper, gaps | Highest at scale |
1-2 weeks
Walk head office (ERP, BIM, document management, network), interview project managers about current pain points, review one or two active sites.
1-2 weeks
Written scope: head-office IT, project mobilisation framework, site-connectivity standards, mobile-fleet baseline, SLA matrix.
4-8 weeks
Head-office cutover with parallel coverage. First new project mobilised under the new IT framework: site connectivity, mobile-fleet deployment, project access setup.
Continuous
Monthly KPI report: head-office IT health, active project IT status, mobile-fleet metrics, security posture. Quarterly review with senior management.
“We are a main contractor with five active projects ranging from villa clusters to mid-rise commercial. Our previous MSP did not understand construction; project mobilisations took two weeks longer than they should have, site connectivity was unreliable, and BIM workstation performance was a chronic complaint. GR rebuilt our entire IT stack in 10 weeks. Project mobilisation is now four days. Site connectivity at all five active sites is 99%+. BIM workstation complaints have stopped.”
A 1-2 week walkthrough of head office and an active site, with a written scope covering BIM, ERP, site connectivity, mobile-fleet, multi-party project IT, and SLA matrix.
Explore more solutions that work great with this service