Structured cabling is one of the few IT investments that lasts 15-20 years. Done well, it makes every subsequent technology (WiFi, IP telephony, CCTV, AV, EV charging) easy to deploy. Done poorly, it limits every future system. We design, install, and certify structured cabling for UAE workplaces: new builds, fit-outs, refurbishments, and retrofits. Copper, fibre, and AV cabling under one project plan.

Cat6 for cost-sensitive new offices, Cat6A as the 2026 default for new builds (supports 10G to PoE++), Cat7 for specialised environments. Drops to desks, AP locations, CCTV cameras, IoT devices, room control panels.
Multimode (OM3/4/5) for in-building backbone and high-bandwidth runs. Singlemode (OS2) for inter-building, campus, or long runs. Fusion splicing, termination, OTDR certification.
Cabling for Microsoft Teams Phone, Yealink IP phones, conference rooms (meeting room cabling for Teams Rooms / Zoom Rooms hardware), display wall infrastructure, audio system runs.
CCTV camera drops with proper PoE support, intrusion-detection sensor wiring, access-control reader cabling, intercom and door-station cabling. SIRA-compliant where required.
Server cabinet patching, structured cable management, hot-aisle / cold-aisle aware routing, fibre patching between racks, KVM cabling, intelligent PDU integration.
Per-drop testing with Fluke / Idea Networks certifier. As-built drawings, port-to-port labelling, patch-panel diagrams, cable schedule. Documentation hand-over to your IT team.
Most cabling contractors install what the architect specified. We design what your IT systems will need over the next 15 years and install for that, not for the absolute minimum. PoE++ ready, fibre backbone ready, room-count appropriate.
Manufacturer-certified installers (Panduit, Commscope, Legrand, Excel, Nexans). 25-year manufacturer performance warranties available on certified installations. Test results per drop, signed off.
Multiple cabling categories under one project plan and one accountable contractor. Fewer trade boundaries means fewer disputes, faster completion, single point of accountability for snags.
When cabling is ready, we are ready to deploy WiFi, IP telephony, CCTV, Teams Rooms, network switches on the same site visit. New offices commission faster because cabling and IT-systems team are one team.
Shell-and-core to fully cabled office. Drops to every desk, AP location, conference room, CCTV camera, building automation.
Out-of-date cabling replaced with Cat6A and fibre. Phased install minimising downtime.
Consistent cabling standards across stores. POS, payment terminals, CCTV, customer WiFi, BGM audio.
Medical-grade cabling. Clinical areas, isolation rooms, imaging suites, nurse stations, medical IoT. Cleanroom-aware installation.
Industrial-grade cabling. Fibre to operations zones, WiFi-AP runs across high-bay ceilings, scanner and AGV connectivity.
Campus-scale cabling. Classroom drops, faculty offices, labs, libraries, AV rooms, examination centres.
| Feature | GR structured cabling | Generic cabling contractor | Electrician adds data drops | AV installer does it |
|---|---|---|---|---|
Cat6A default for new builds | Cat6 to save money | Whatever requested | Variable | |
Manufacturer-certified installers | Variable | Rarely | Variable | |
Per-drop testing certified | Sometimes | Rare | Sometimes | |
25-year performance warranty available | Sometimes | Rare | ||
IT-aware cabling design | Mechanical install only | AV-focused | ||
As-built documentation | Variable | No | Variable | |
Coordinated with WiFi, CCTV, AV install | Separate trades | Separate | Partial | |
UAE on-site response post-install | Variable | Variable | Variable |
1 week
On-site walk-through. Drop count per floor, fibre backbone routing, server-room location, containment routes. IT-system requirements gathered. Output: written cabling design and bill of materials.
2-6 weeks
Materials procured (Cat6A cable, fibre, patch panels, racks, faceplates). First-fix during construction: cable runs in containment, drops to ceiling height. Coordinated with electrical and other trades.
1-3 weeks
Final fit-out: outlets terminated, patch panels installed, racks built, fibre fusion-spliced. Patch leads run. Server-room patching to switches and routers.
1 week
Per-drop testing with calibrated certifier. As-built drawings, port-to-port labelling, patch-panel diagrams. Snag list closed. Certification documents handed to client. 25-year manufacturer warranty registered.
“We were burned by a previous office fit-out where the cabling was Cat6 instead of Cat6A and we had to re-cable five years later to support PoE++ for new APs and CCTV cameras. For our new HQ we engaged GR to specify and install the cabling. They went Cat6A across the board, full fibre backbone, certified every drop. The IT install for WiFi, Teams Rooms, and CCTV was straightforward because the cabling was right. We will not be re-cabling for 20 years.”
A site visit covers your floorplan, drop count requirements, fibre routing, server-room layout, construction programme. Output: written cabling design with bill of materials, certification plan, and fixed fee.